Map

Pre-Construction Homes Near the Ontario Line: Stations, Timeline and Projects (2026)

By TallProperty · November 17, 2026 · 6 min read

Pre-Construction Homes Near the Ontario Line: Stations, Timeline and Projects (2026)

Short answer: the Ontario Line is a 15.6 km subway with 15 new stations, running from Exhibition Place through downtown and the east end to Line 5 Eglinton at Don Mills Road (Don Valley Station). As of November 2026, tunnelling for the downtown section is under way, and Metrolinx expects nearly 400,000 trips a day once it is complete. Metrolinx has not published an opening year on the project pages we checked. Pre-construction condos close to the route are mainly in King West, along Queen Street East and in the east end. Below are the station names confirmed so far, the construction timeline and the Tall Property project pages along the corridor.

This guide uses only Metrolinx and City of Toronto sources and is current as of November 2026. We will update it as Metrolinx publishes new information.

What the Ontario Line is

According to the Metrolinx Ontario Line project page (route map labelled “updated April 2026”), the line is a 15.6 km subway with 15 new stations. It starts at Exhibition Place on the west side of downtown, crosses the core, turns north through the east end and ends at Line 5 Eglinton at Don Mills Road, where the northern terminal is Don Valley Station.

The line is designed to connect with the rest of the network rather than run on its own. The City of Toronto’s Ontario Line page (dated September 11, 2026) lists six interchange stations:

  • Exhibition and East Harbour: connections to GO Transit
  • Queen and Osgoode: connections to Line 1 Yonge-University
  • Pape: connection to Line 2 Bloor-Danforth
  • Don Valley: connection to Line 5 Eglinton

Metrolinx also says the line will connect with streetcar lines at 10 stations and with bus services at 12 stations. For buyers, those connections often matter as much as the subway itself, because they decide how easily you reach places the line does not go.

Ontario Line stations confirmed so far

Metrolinx says there will be 15 stations. The sources we checked name 12 of them, several under new names. They are listed below, but this is not an official station order. The other three are on the Metrolinx route map, and we will add them once we have confirmed them there. Station sites and entrances can change during design, so check the Metrolinx map before relying on any one location.

Station Former working name Interchange (per the City of Toronto)
Exhibition (Ontario Place) – GO Transit
King West King-Bathurst –
Chinatown Queen-Spadina –
Osgoode – Line 1
Queen – Line 1
Moss Park – –
Distillery District Corktown –
East Harbour – GO Transit
Leslieville Riverside-Leslieville –
Gerrard – –
Pape – Line 2
Don Valley Ontario Science Centre Line 5

Station names and renames are from the Metrolinx tunnelling announcement (April 20, 2026) and the City of Toronto’s Ontario Line page.

Ontario Line timeline: what has happened so far

These are the milestones Metrolinx lists on its project page:

  • March 2022: groundbreaking at Exhibition Station.
  • November 2022: contracts awarded.
  • January 2024: the Pape Tunnel and Underground Stations agreement signed.
  • February 2024: the Elevated Guideway and Stations agreement signed.
  • April 2026: tunnelling for the downtown section began.

In its April 2026 announcement, Metrolinx said two tunnel boring machines, named Libby and Corkie, are digging twin tunnels about 6 km long. The tunnels are about 40 m below street level and run from a launch shaft east of Exhibition Station to a point west of the Don River. A second tunnelled section runs mostly under Pape Avenue, and Gerrard and Carlaw is the site of a second launch shaft.

When will the Ontario Line open?

As of November 2026, neither the Metrolinx project page nor the City of Toronto’s Ontario Line page states an opening year. You may see dates quoted elsewhere online. We do not repeat them here because we could not confirm them on those official pages. If an opening date affects your decision, ask for the source, and treat any date as an estimate until Metrolinx confirms it.

What the Ontario Line means for pre-construction buyers

A new subway can change how a neighbourhood works day to day, especially for people who don’t drive to work. It does not guarantee anything about prices or rents, and we make no predictions about either. Here is a practical way to think about it.

Match your occupancy to the transit timeline

A pre-construction condo bought today may be ready before or after the Ontario Line opens. Without an official opening year, plan as if your building could be finished before the subway. Ask yourself whether the location works with the transit you have now: Line 1, Line 2, streetcars, buses and GO Transit. If the answer is yes, the Ontario Line is an extra benefit, not the whole case for buying.

Expect construction nearby for some time

Station sites, launch shafts and elevated guideway work all bring road changes and noise. If you plan to live in the unit, or rent it out, while the line is being built, find out which construction sites are near the building. The City of Toronto’s Ontario Line page and the Metrolinx project page are the places to check for local construction updates.

Look at the connections, not only the station

The six interchange stations put Ontario Line riders one transfer away from GO Transit, Line 1, Line 2 and Line 5. A home near an interchange such as Queen, Osgoode, Pape or East Harbour gives more route choices than a home near a stop on only one line. With streetcar connections at 10 stations, neighbourhoods a little way from a station can also benefit.

Transit-oriented communities

Some new buildings along the Ontario Line corridor are marketed as “transit-oriented”. Treat the label as a starting point. Check the future station site on the Metrolinx map, the street you would walk and the current transit options, then decide for yourself how close the building really is.

Questions to ask before you sign

  • What is the expected occupancy date, and what does the agreement say about delays?
  • Which Ontario Line station is closest, and where is it on the current Metrolinx map?
  • Is there construction (station, shaft or guideway) on or beside the block?
  • How does the location work for transit today, without the Ontario Line?

Tall Property projects along the Ontario Line corridor

These Tall Property project pages are in parts of the city the line passes through. We describe them by street and neighbourhood only. Pricing and availability change, so contact us for current details.

We have not measured walking distances from these buildings to future station entrances, which are not final. Use the Metrolinx route map to find the nearest station before you decide.

For more downtown and city-wide options, browse our pre-construction homes in Toronto. If you are comparing transit corridors, see our guides to pre-construction homes near GO stations and condos and townhomes near the Hurontario LRT.

FAQ

How many stations will the Ontario Line have?

Metrolinx says 15 new stations along a 15.6 km route from Exhibition Place to Don Valley Station at Line 5 Eglinton and Don Mills Road. Six of them are interchange stations.

When does the Ontario Line open?

As of November 2026, the Metrolinx project page and the City of Toronto’s Ontario Line page do not state an opening year. Tunnelling for the downtown section began in April 2026.

Which stations connect to other subway lines?

According to the City of Toronto, Queen and Osgoode connect to Line 1, Pape connects to Line 2 and Don Valley connects to Line 5. Exhibition and East Harbour connect to GO Transit.

Will a condo near the Ontario Line go up in value?

No one can promise that. Transit is one factor among many, including price, building quality, occupancy timing and the wider market. Buy a location that works for you with today’s transit, and treat the Ontario Line as an extra benefit.

Which pre-construction projects are near the Ontario Line?

Tall Property pages in the corridor include 400 King West (King Street West), Queen & Sherbourne (near Queen and Sherbourne) and 225 Queen Street East (Corktown). Call us at 416-878-0749 or register with us for current pricing and availability.

Photo: Ontario Line construction at Yonge and Queen, October 10, 2025, by Dillan Payne, via Wikimedia Commons, licensed under CC BY-SA 4.0.

Questions about a project? Ask us

Why register with TallProperty

  • First access to pricing and floor plans, often before the public launch.
  • Builder incentives and deposit structures, explained in plain language.
  • New launches in the areas and home types you choose, by email.
  • Free to register. Prefer to talk? Call 416-878-0749.

    Register Now for Platinum Prices and Incentives

    Are you realtor?* YesNo

    By signing up, you will receive more information regarding this project as well as be providing express consent to be on the Tall Property mailing and short message service list. You will have the option to unsubscribe at any time. We are pre-construction specialists and do not represent the developer.

    Compare